Item Information
Title:ELGIN STREET AND HAWTHORNE AVENUE FUNCTIONAL DESIGN STUDY

Item #: Status:
Type:1 1 #:SOMERSET (14); CAPITALE(17)
Version:2nd Sponsor:
Meeting Date:2017-May-10 2017-May-10 2 Ward:SOMERSET (14); CAPITAL (17)
Meeting Type:City Council Video: View Video
Attachments:Minute Extract.docx    
Text
History
 VersionItem #TypeStatusMeeting DateMeeting Type
 1st12017-May-03TRC
 2nd12017-May-10City Council
Vote Records
Passed    Motion To: RECOMMANDATIONS DU COMITÉ, TELLES QUE MODIFIÉES
Que le Conseil approuve ce qui suit: 1. Les conceptions fonctionnelles utilisées conformément aux désignations de rue principale traditionnelle de la ville, à la politique sur les rues complètes et aux Normes de conception accessible de la Ville, tel que décrit dans le présent rapport, pour : a. la rue Elgin (de l’avenue Laurier à la promenade Queen Elizabeth); b. la rue Waverley (de la rue Elgin à la voie Jack Purcell); c. L’avenue Hawthorne (du pont Pretoria à la rue Main); 2. Demande au personnel de la Direction générale des transports, en concertation avec le conseiller du quartier, d’afficher une limite de vitesse sur la rue Elgin (de la rue Lisgar à la rue McLeod) de 30 km/heure, tel que décrit dans le présent rapport. 3. Que le personnel trouve des solutions pour créer des places de stationnement temporaires supplémentaires à proximité de la rue Elgin durant les travaux; a. le directeur général des Travaux publics et de l’Environnement soit habilité, pour la durée des travaux sur la rue Elgin, à décider des dates et des heures auxquelles le stationnement sera gratuit à l’hôtel de ville; b. le personnel collabore avec les commerçants de la rue Elgin pendant la durée des travaux pour coordonner l’affichage des places de stationnement public temporaire et gratuit. 4. Que les 90 places de stationnement flexibles soient aménagées et réservées au stationnement et aux terrasses. 5. Que les demandes de renouvellement de permis délivrés aux termes du règlement actuel pour la rue elgin soient assujetties aux dispositions du nouveau règlement sur les terrasses sur emprise, à l’exception des exigences relatives aux normes de conception accessible et à la voie piétonne, et que ces exigences soient suspendues jusqu’à ce que la reconstruction des installations pour piétons adjacentes aux terrasses existantes prévues dans le cadre du projet soit terminée. 6. Que le Conseil municipal de demander au personnel de concevoir, en consultation avec les membres du Conseil, un plan de gestion de la circulation exhaustif pour le projet de reconstruction de la rue Elgin et de l’avenue Hawthorne, ainsi qu’un plan de communications détaillé, comme l’explique la présente motion. COMMITTEE RECOMMENDATIONS AS AMENDED
That Council approve the following: 1. The functional designs which have addressed the City’s Traditional Mainstreet designation, Complete Streets policy and the City’s accessibility design standards, as described in this report, for: a. Elgin Street (Laurier Avenue to Queen Elizabeth Driveway); b. Waverley Street (Elgin Street to Jack Purcell Lane); c. Hawthorne Avenue (Pretoria Bridge to Main Street); and, 2. Direct Transportation Services staff, in consultation with the Ward Councillor, to post the speed limit of Elgin Street (Lisgar Street to McLeod Street) as 30km/h, as described in this report. 3. That staff work to provide opportunities for additional temporary public parking within close vicinity of Elgin Street during reconstruction; a. The General Manager, Public Works and Environmental Services be delegated the authority, during the time that Elgin is under reconstruction, to designate dates and times when parking at City Hall will be free of charge; and b. Staff work with the business owners on Elgin Street during the reconstruction period to co-ordinate advertising of the opportunities for temporary and for free public parking. 4. That the 90 flexible parking spaces be designed for the purpose of parking or patio use only. 5. That applications for the renewal of permits administered through the Right of Way Patio By-law on Elgin Street are subject to the provisions of the new Right of Way Patio By-law except for the requirements regarding the Accessibility Design Standards and pedestrian clearway, which such requirements are deferred until the reconstruction of the pedestrian elements of the project adjacent to the existing patios are complete. 6. That City Council direct staff to develop a comprehensive Traffic Management Plan for the Elgin Street and Hawthorne Avenue Reconstruction project, as well as a detailed communications plan, as described in this motion and in consultation with Members of Council.
(Councillor / Conseiller) S. Moffatt  Yes
(Councillor / Conseiller) R. Chiarelli  Absent
(Councillor / Conseiller) E. El-Chantiry  Yes
(Councillor / Conseiller) D. Chernushenko  Yes
(Councillor / Conseiller) S. Blais  No
(Councillor / Conseiller) M. Fleury  Yes
(Councillor / Conseiller) M. Taylor  Yes
(Councillor / Conseiller) B. Monette  Yes
(Councillor / Conseillère) J. Harder  Yes
(Councillor / Conseiller) J. Cloutier  Yes
(Councillor / Conseiller) R. Brockington  Yes
(Councillor / Conseiller) G. Darouze  Yes
(Councillor / Conseillère) M. Wilkinson  Yes
(Councillor / Conseiller) S. Qadri  Yes
(Councillor / Conseiller) K. Egli  Yes
(Councillor / Conseillère) D. Deans  Yes
(Councillor / Conseiller) J. Mitic  Absent
(Councillor / Conseiller) T. Tierney  No
(Councillor / Conseiller) J. Leiper  Yes
(Councillor / Conseiller) A. Hubley  Yes
(Mayor / Maire) J. Watson  Yes
(Councillor / Conseillère) C. McKenney  Yes
(Councillor / Conseiller) T. Nussbaum  Yes
(Councillor / Conseiller) M. Qaqish  Yes